KING JASON APARTMENTS & COMMON AREAS

APARTMENTS

( A )

A solar system is installed to provide domestic hot water .The  Solar system is using all the available solar energy and at times when it’s not enough then the Gas  boiler is switched ON through a  control system .

The solar system consists of  3 Solar panels 1.5x 1.0  & 1 x 400 Litre  Hot water cylinder for each floor.

 

( B )

A smart VRV system is installed for the space air conditioning and heating of the extra 2 floors (3rd & 4th ) . The system consists of 1 Daikin air cooled  Outdoor unit and 12  ceiling concealedIndoor units  . The benefits of the air cooled VRV system from the spit unit type air conditioning is the efficiency ( 20 to 30 % higher ) , the less number of outdoor units and the ability to install the outdoor units much longer distance from the indoors .

 

( C )

A complete plumbing system is installed consisting of : ( a)  Central pipes & final piping to sanitary ware with PPR-80 for both the hot and cold water as well as the drinking water. ( b ) A complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the first outside manhole. ( c ) Connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. ( d ) 2 existing  pressure pumps systems are  re installed  to provide high water pressure to all the sanitary fittings, saving water as well as energy .

 

( D )

All W.C areas with inline fans, ducting and grills.

 

COMMON AREAS AND KITCHENS

( A )

Domestic hot water is supplied via the existing Oil  boiler i through a  control system .

 

( B )

Split units are installed in these areas. 4 DAIKIN  round flow cassettes in veranda area. 4 wall type DAIKIN split units in kitchen and Lantza areas, 2 DAIKIN ceiling concealed split units in Guest change rooms.

 

( C )

A complete plumbing system is installed consisting of : ( a )  Central pipes & final piping to sanitary ware with PPR-80 for both the hot and cold water as well as the drinking water which are connected to the existing central pipes. ( b ) A complete sewage system consists of all the pvc plastic piping for all the sanitary fittings & floor drains to the first outside manhole. ( c ) Connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. ( d ) All piping is connected to  existing  pressure pumps systems are  re installed  to provide high water pressure to all the sanitary fittings, saving water as well as energy .

 

( D )

All W.C areas & store rooms  have inline fans, ducting and grills.