Supply & Installation of 2 530 KW Chiller / Heat Pumps – KANIKA – Amavi Hotel – Project Update

mechanical installations cyprus

The Amavi is currently under construction by the award-winning Kanika Hotels & Resorts. Upon completion, it will provide a unique heaven for couples; a tranquil, intimate environment where they can escape from the world outside to enjoy blissful relaxation.

mechanical installations cyprus

Following years of cooperation with Kanika Hotels & Resorts, Z&X Mechanical Installations has proudly been appointed by Kanika Developments for the complete mechanical services installation for Kanika Amavi Hotel in Paphos.

A 5-floor hotel with 155 rooms including various suites, various public areas (bars, restaurants, etc.) 3 public pools and 14 private pools for cabana rooms.

Below is an update of the project description of the works carried out by Z&X Mechanical Installations Ltd.

AIR CONDITION AND DOMESTIC HOT WATER HEAT PUMPS (CHILLERS) AND PLANT ROOM PUMPS

(A) One 530 KW Multipurpose Chiller/Heat Pump producing hot and cold water at the same time. Delivered on site and installed in position on the roof.

The machine weighs 8060 Kg, is 7.20 m long and 2.26 m wide

As Indicated by the name the heat pump serves Multi Purposes.

It can supply Chilled water to the air conditioning system whilst simultaneously supplying hot water which is used to heat the Domestic hot water cylinders and swimming pools.

 

(B) One 530 KW Chiller / Heat Pump producing cold water in summer and hot water in winter. Delivered on site and installed in position on the roof.

The machine weighs 6760 Kg, is 5.8 m long and 2.26 m wide

It can supply either Chilled water for Summer Air conditioning or Hot Water for Winter Air conditioning.

 

NOTE: Both Heat Pumps / Chillers are equipped with heat recovery, which assists the heating of the Domestic Hot Water Cylinders via a Heat Exchange.

Primary Pumps for circulation of water from Heat pumps to Chillers are installed on the roof.

Secondary pumps for circulation of water from the Heat pumps throughout the hotel for Air conditioning are located in the Plant room. Installation of these pumps is in progress.

HEAT PUMP RAISED BY CRANE FOR INSTALLATION ON ROOF

mechanical installations cyprus
mechanical installations cyprus
mechanical installations cyprus

PUMPS FOR HOT AND COLD WATER THROUGH OUT THE HOTEL FROM THE CHILLERS

mechanical installations cyprus

SPECIAL HEAVY DUTY MOBILE CRANE FOR LIFTING AND POSITIONING OF HEAT PUMPS ON ROOF

mechanical installations cyprus

TELESCOPIC FORKLIFT ASSISTING TO REMOVE HEAT PUMP FROM CONTAINER

mechanical installations cyprus

HEAT PUMP REMOVED FROM CONTAINER AND HELD BY MOBILE CRANE AFTER INSTALLATION OF ANTI VIBRATION PADS

mechanical installations cyprus

CHILLERS ON THEIR BASES ON ROOF

mechanical installations cyprus

200 mm DIAMETER PPR MAIN WATER PIPES FROM ROOF HEAT PUMPS

mechanical installations cyprus

CHILLERS CONNECTED TO SECONDARY PUMPS DISTRIBUTION SYSTEM IN BASEMENT MAIN PLANT ROOM

mechanical installations cyprus