GOLD FACTORY LARNACA

PROJECT DESCRIPTION

GOLD FACTORY – LARNACA

Package Units with ducts and grills for the factory area to provide heating and cooling

 

( A )

A solar system is installed to provide domestic hot water . The Solar system is using all the available solar energy. The solar system consists of 6 Solar panels , 2 Hot water cylinders , circulating pumps and solar control station .

 

( B )

A split unit system is installed for the space air conditioning and heating of offices. The system consists of 40 air cooled Outdoor units and 40 Indoor units (cassettes)

 

( C )

A complete plumbing system is installed consists of : ( a) pex pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water . ( b ) a complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the fist outside manhole. ( c ) connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. ( d ) an inverter pressure pump system is installed to provide high water pressure to all the sanitary fittings, saving water as well as energy . ( e ) a water softener is installed for the production of soft water , avoiding building up of scale, saving energy and giving long life to all mixers , kitchen equipment and sanitary fittings.

OTHER PROJECTS

Show Buttons
Hide Buttons