KEO Warehouse-Geroskipou

KEO proudly incorporates the island’s heritage and tradition in all aspects of its work to be a successful enterprise by driving growth through market orientation, innovative technology, inspired employees striving excellence through continuous education, committed business partners, winning shareholder value, and giving people of all generations and all budgets, local and international quality brands, all year round.

Z&X Mechanical Installations, with over 30 years experience in the field and a strong reputation, was proudly appointed as the mechanical engineering company to undertake, supply, install and complete all below works from scratch. 

A complete plumbing system is installed and consists of:


(a) pex pipe in pipe piping and mainfolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water.


(b) a complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the fist outside manhole.


(c) connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories.


(d) an inverter pressure pump system is installed to provide high water pressure to all the sanitary fittings, saving water as well as energy.


(e) a water softener is installed for the production of soft water, avoiding building up of scale, saving energy and giving long life to all mixers, kitchen equipment and sanitary fittings.

Water heaters are installed to provide domestic hot water

 Split units for the space air conditioning and heating. The system consists of 7 air cooled outdoor units and 7 indoor units .

A Firefighting pressure system with 3 fire hoses are installed.