AYII ANARGIROI SPA RESORT

PROJECT DESCRIPTION

AYII ANARGIROI SPA RESORT – MILIOU

( A )

A Geothermal system is installed to provide air conditioning and space heating as well as domestic hot water and sulfur hot water for the use in the treatment rooms . Also it is used for the heating of the indoor sulfur heated pools .

The geothermal system is consists of : a) 120 Vertical Bore holes of 100m depth each , 24000 M of geothermal heat exchanger total length .b) 5 Geothermal heat pumps and 5 Heat exchangers for the production of domestic hot water , sulfur hot water and heating of the indoor sulfur heated pools .c) 15geothermal VRV system for the space air conditioning and heating with water cooled outdoor units and ceeling concealed indoor units.

( B )

A solar system is installed to provide domestic hot water , sulfur hot water , hot water for the underfloor heating and indoor sulfur water swimming pool heating.The Solar system is using all the available solar energy and at times when it’s not enough then the geothermal heat pumps is switched ON through a smart BMS control system .

The solar system consists of 140 Solar panels , 6 Hot water cylinders , circulating pumps and solar control station .

( C )

A clever smart solar system is installed to provide all the electricity needed for the filtration and circulation system of the swimming pools . It consists of 36 Photovoltaic panels, 6 Solar pumps and 6 Controllers . This system is enough to keep the swimming pool clean and hygiene all day long without the use of any electrical supply.

( D )

A complete plumbing system is installed consists of : ( a) pex pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water . ( b ) a complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the fist outside manhole. ( c ) connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. ( d ) an inverter pressure pump system is installed to provide high water pressure to all the sanitary fittings, saving water as well as energy . ( e ) a water softener is installed for the production of soft water , avoiding building up of scale, saving energy and giving long life to all mixers , kitchen equipment and sanitary fittings.

( E )

All the electromechanical work , machinery and systems of the swimming pool is installed consisting of : ( a ) all pvc piping from the pumps and filters in the plant room to all the inlets , drains and other fittings in the swimming pool . ( b ) all the fittings in the swimming pool like inlets, drains vacuum point, lights and fixtures. ( c ) all the electrical work like wiring , control and electrical panel , connection of lights, pumps and fixtures. ( d ) supply and installation of all the machinery and equipment in the plant room like pumps , filters and fixtures. ( e ) installation of a smart salinator that is producing chlorine by adding salt into the pool water. When the salty water is passing through the salinator it brakes salt into chlorine that returns back to the pool and natrium gas that is left free to the atmosphere . The benefit of this system is that the produced chlorine doesn’t smell and also it’s very economical.

( F )

A smart BMS ( control system ) is installed complete with sensors , wiring , and control panel to manage all the above described systems ,for maximum efficiency and energy saving .

OTHER PROJECTS

Show Buttons
Hide Buttons