( A )

A solar system is installed to provide domestic hot water .  The Solar system is using all the available solar energy and at times when it’s not enough then Oil boiler is switched ON through a smart BMS control system .

The solar system consists of 32 Solar panels , 3 Hot water cylinders , circulating pumps and solar control station .

 

( B )

A clever smart solar system is installed to provide all the electricity needed for the filtration and circulation system of the swimming pools . It consists of 48 Photovoltaic panels, 6 Solar pumps and 6 Controllers . This system is enough to keep the swimming pool clean and hygiene all day long without the use of any electrical supply.

 

( C )

A smart VRV system is installed for the space air conditioning and heating . The system consists of 16 air cooled  Outdoor units and 160 Indoor units . The benefits of the air cooled VRV system from the spit unit type air conditioning is the efficiency     ( 20 to 30 % higher ) , the less number of outdoor units and the ability to install the outdoor units much longer .

 

( D )

A complete plumbing system is installed consists of : ( a) pex pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water . ( b ) a complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the fist outside manhole. ( c ) connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. ( d ) an inverter pressure pump system is installed to provide high water pressure to all the sanitary fittings, saving water as well as energy . ( e ) a water softener is installed for the production of soft water , avoiding building up of scale, saving energy and giving long life to all mixers , kitchen equipment and sanitary fittings.

 

( E )

All the electromechanical work , machinery and systems of the swimming pool is installed consisting of : ( a ) all pvc piping from the pumps and filters in the plant room to all the inlets , drains and other fittings in the swimming pool . ( b ) all the fittings in the swimming pool like inlets, drains vacuum point, lights and fixtures. ( c ) all the electrical work like wiring , control and electrical panel , connection of lights, pumps and fixtures. ( d ) supply and installation of all the machinery and equipment in the plant room like pumps , filters and fixtures. ( e ) installation of a smart  salinator  that is producing chlorine by adding salt into the pool water. When the salty water is passing through the salinator  it brakes salt into chlorine that returns back to the pool and natrium gas that is left free to the atmosphere . The benefit of this system is that the produced chlorine doesn’t smell and also it’s very economical.