TEPAK – EASTLAND STUDENTS RESIDENCE

PROJECT DESCRIPTION

TEPAK – EASTLAND STUDENTS RESIDENCE

( A )

 

A solar system is installed to provide domestic hot water. The Solar system is using all the available Solar energy and at times when it’s not enough then oil is switched ON through a smart BMS control system. The Solar system consists of  Solar panels, 1X 2500L Hot water cyclinder, circulating pumps and solar control station.

(B)

A smart VRV system is installed for the space air conditioning and heating for coffee shop  and study area. The system consists of 2 air cooled Outdoor units 14 Indoor units. The benefits of the air cooled VRV system from the split unit type air conditioning is the efficiency (20 to 30 % higher), the less number of outdoor units and the ability to install the outdoor units much longer. Wall type split units are installed for all apartment (32 unit).

(c)

A copmlete plumbing system is installed consists of: (a) pex pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water aswell as the drinking water. (b) a complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the fist outside manhole. (c) connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. (d) an inverter pressure pump system is installed to provide high water pressure tp all the sanitary fittings, saving water as well as energy. (e) a water softener is installed for the production of soft water, avoiding building up of scale, savng energy and giving long life to all mixers, kitchen equipment and sanitary fittings.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OTHER PROJECTS

Show Buttons
Hide Buttons