Advanced Imaging Medical (AIM) Diagnostic Center

The AIM Diagnostic center has started its operation in Paphos and is a true gem and jewel for the Health sector in Cyprus.

The state-of-the-art center, which is located on Demokratia Avenue and Florinis Street in Paphos (a short walk from Stelios Kyriakides Stadium), was designed exclusively to be a radiodiagnostic center, from the beginning to the end. The Center is equipped with Technology and machines that make it the best of its kind in Cyprus and one of the few in Europe. In addition to the latest radiodiagnostic machines, magnetic and axial tomographs, ultrasound and other cutting edge for the new AIM Diagnostic Center is its human resources. A team of specialised health professionals who are ready to serve you in the most humane way.

It also has an important innovation unique in Cyprus and one of the few in Europe in the Magnetic Tomograph. This specific tomograph model is spacious, having a painted tunnel that offers a more pleasant experience to the patient, while in the Magnetic Tomograph area there is a specially designed window, the only one in Cyprus, which allows natural light to enter the room to combat claustrophobia.

Z&X Mechanical Installations completed all the mechanical installations of the diagnostic clinic, which included:

*All the sewage and planning work and the installation of all sanitary fittings.

*Space cooling and heating with high efficiency.

*VRV system and cooling of the MRI machine by installing a high efficiency Daikin chiller.

*Installation of 20KW photovoltaics to cover the energy needs of the clinic. 

What is the AIM Diagnostic Center ?

AIM Diagnostic Center is a modern private diagnostic center that participates in GESY and aims to offer all visitors a high level of diagnostic tests. It is located at a key geographical point in the province of Paphos, offering quick and direct access via the main bypass road from the city as well as from all other cities via the national highway.

The AIM Diagnostic Center came to fill the gap presented in the field of diagnostic tests, offering the whole range of machine tests: Magnetic Tomography (MRI), Computed Tomography (CT), Ultrasound, Digital X-rays, Digital Mammograms – 3D, Bone Density Examinations /Osteoporosis (DEXA) and Panoramic X-rays, always ensuring optimal quality.

Magnetic tomograph with many advantages

Magnetic Tomography is a diagnostic scanning technique that uses a strong wave and radio frequency field. During the examination, several images (sections) of the anatomical area being examined are taken, allowing the doctor to have a detailed picture. The examinee is not exposed to ionizing radiation at all, which makes the examination the first choice for pregnant women and small children.

The AIM Diagnostic Center has the top model Siemens Avanto 18-channel Magnetic Tomograph which comes with the necessary multi-channel coils for conducting Magnetic Tomography examinations. It is a spacious model with a painted tunnel that offers a more pleasant experience to the patient.

In the MRI room there is a specially designed window, the only one in Cyprus, which allows natural light to enter the room to combat claustrophobia.

The center fully covers all MRI applications.

Classic MRI applications: brain, neck, chest, upper and lower abdomen, spine, joints, bones and soft tissues.

Special applications:

Brain Magnetic Angiography and Brain Spectroscopy (MR Spectroscopy)

Magnetic urography

Magnetic Cholangiopancreatography (MRCP)

Magnetic Mammography

Prostate MRI

Magnetic Enterography

Cardiac MRI

Magnetic Tomography for the measurement of fat fraction and degree of steatosis of the liver

Designed exclusively for diagnostic radiology center

The AIM Diagnostic Center has the most modern facilities as it is the only center in Cyprus that was built from scratch with the necessary specifications of a radiodiagnostic center , offering a pleasant experience for visitors and staff.

The AIM Diagnostic Center is equipped with state-of-the-art machines, radiographer technologists with experience in all machines and experienced reception staff who are able to guide and answer questions about exam preparation and procedure.

The center is staffed with experienced medical radiologists who can offer high quality services while respecting each visitor. The AIM Diagnostic Center aims to provide professional and immediate service to the public in appointment requests for all tests and above all in the immediate receipt of results.

Read more

Tepak Paphos Project

Z&X Mechanical Installations, with over 30 years experience in the field and a strong reputation, was proudly appointed as the mechanical engineering company to undertake the construction of Tepak Paphos Project.

The project concerns the construction of the building facilities of the School of Tourism, Hospitality and Entrepreneurship Management of TEPAK in Paphos. The School will be housed in a three – story building, with a basement and a ground floor, and will consist of:

 ∙ Staff offices

 ∙ Service areas

∙ Open study areas

∙ Auxiliary spaces

 ∙ Storage areas

 ∙ Specialized laboratories

∙ Auditoriums/classrooms

 ∙ Library/reading room

 ∙ Cafeteria

 ∙ Gym

 ∙ Sitting areas

 ∙ Parking spaces for cars, mopeds and bicycles

 ∙ Outdoor green space/square on the ground floor

The construction of the School aims at the development and revitalization of the area. It also aims at the scientific upgrading of the sector and the interconnection of education with the needs of the labor market, with the consequent increase in the number of qualified personnel available to work in local hotel and tourist units.

In addition, by strengthening the student and academic community in the city, conditions are created for intellectual, economic and social development and flourishing, with the dominant phenomena being the extroversion and openness of the local society both at the national and international level.

 1. The air conditioning systems consist of:


(a) A number of outdoor VRF systems throughout the building for all areas.


(b) Indoor VRF units, both ceiling concealed with grills and cassette type.


(c) A number of split unit type AC units where appropriate (server room, battery room, etc.).

2. A complete domestic hot water reticulation system is to be installed and will consist of:


(a) A network of PPR piping (hot, cold, return) distributing water throughout the building to all areas, kitchens, toilets, staff cousins and public areas as required.


(b) A solar system is installed on the roof to provide domestic hot water heating. The Solar system is using all the available solar energy and at times when it’s not enough, it is supplemented by a heat pump installed on the roof.


The system consists of a number of Solar panels, 2 Hot water cylinders and circulating pumps.

3. A complete plumbing system is to be installed and will consist of:


(a) A network of PPR piping (hot, cold, return) distributing water throughout the building to all areas as required.


(b) Pex – C pipe in pipe and manifolds used for the piping of all the sanitary fittings for both – hot and cold water.


(c) A complete sewage system which consists of UPVC plastic piping within concrete foundations and in floor screeds, and PPR 12 DB exposed piping within ceilings and risers for all the sanitary fittings.


(d) Sewage is mostly gravity fed to the SAPA connection point, except the basement areas, where 2No sewage pits housing 2No pumps each, sent the collected material to the closest manhole 5m upwards.


(e) An inverter pressure pump system is installed to provide high water pressure to all the sanitary fittings, saving water as well as energy.


(f) A softener is installed for water processing, as well as an RO system, to supply water to certain areas in kitchen.

4. A complete firefighting system is to be installed and will consist of:


(a) A pump set that sends water to all fire hose reels and sprinklers with a diesel back up in case of power failure and a jockey pump.


(b) A galvanized pipe network to distribute water to all fire hose reels.


(c) 3No Dry risers, one near each main stairwell to supply water from external sources for fire-fighting.


(d) Sprinkler systems are installed in two areas as described below.

1. Basement parking area

2. Parking area ground floor

5. A complete ventilation system is to be installed and will consist of several different types. Each type is a system that comprises from a fan, a line of ducting and grilles at several or one end points of the duct. The types are as listed below:


(1) Exhaust Air Removal


(2) Kitchen Hoods Exhaust Air Removal


(3) Kitchen Hoods Fresh Air Supply


(4) Heat Recovery Unit Air Removal & Supply

a) Exhaust Air Removal

Installed in all areas that the air needs to be removed to remove any smells, and to be replaced by fresh air. Some of those areas are the toilets area in rooms and public toilets, rooms to be used for storage, offices without any natural ventilation, and public areas without any natural ventilation like the ballroom and the spa area.

b) Kitchen Hoods Exhaust Air Removal

Installed in all kitchen areas where cooking takes place and there is a hood to remove all the smells/smoke. Due to the high volume of air removed in very high speeds, fresh air (6. Kitchen Hoods Fresh Air Supply) is also supplied on the hood to assist with the smells/smoke removal, and to prevent the vacuum effect due to suction of air from a closed room. 

c) Heat Recovery Unit Air Removal & Supply

In areas where the design allows it, a heat recovery unit is installed. This system replaces the air in an area with minimum temperature losses as it exchanges the temperature of the air removed with the air supplied. This system assists in electrical savings as the area is kept at a constant temperature and the air conditioning system doesn’t need to work in full power all the time to regulate the temperature.

Read more

Kult Boutique – Limassol

KULT believes that buying the highest quality goods is not just about fashion but about lifestyle. From a casual trip to the beach to the most exclusive occasion, they take great pride in dressing women and men as individuals and strive to offer an elegance of service that is as personal as each client they serve. They appreciate that spending a lot of money online can be a little daunting, which is why they aim to offer the same bespoke service online that they offer in their boutiques, as well as free international shipping for all orders.

The exclusive branded shopping experience that is ‘KULT’ dates back to 1998 – born out of the desire to deliver exceptional high-end luxury boutique services to guests of Cyprus’s leading hospitality company, Thanos Hotels and Resorts.

Today with five distinct stores in Cyprus, they are proud to be the country’s sole importer and distributor of the world’s most renowned luxury fashion brands, retailing labels as unique as Prada, Miu Miu, Gucci, Dolce & Gabbana, Etro, Paul & Joe, Car Shoe and Acqua di Parma exclusively in Cyprus.

Under the company name Anthana – a subsidiary of Thanos Hotels & Resorts – KULT operates boutiques in each of Thanos’s Cypriot hotels, as well as stand-alone boutiques in Nicosia and Limassol.

After the successful and on time completion of the KULT boutique in Nicosia, the owners have trusted Z&X Mechanical Installations for their new boutique store in Limassol, which is situated on the ground floor of One Limassol.

A complete plumbing system is installed and consists of:


(a) High efficiency VRV system is used for space coiling and heating. 


(b) PPR sewage piping is used for all the sanitary fittings. 


(c) Galvanized pipes and sprinklers are used , fixed on the ground floor and mezzanine ceiling , for fire fighting. 

All the above mechanical services have been chosen by the owners to provide to their valuable customers comfortable and safety environment.

The KULT boutique store Limassol will open it’s doors to customers before Christmas 2022 season.

Read more

Primary School Paramithas

Z&X Mechanical Installations, with over 30 years experience in the field and a strong reputation, was proudly appointed as the mechanical engineering company to undertake the renovation of Primary School – Paramithas.

A complete plumbing system is installed and consists of:


(a) Sewage Piping


(b) Hot & Cold water piping


(c) Solar Panels With Hot Water Cylinder


(d) Pressure System for water


(e) Air Conditioning – Split units


(f) Central Heating System à PPR piping and Radiators


(g) Central Heating Plant room with Boiler and Diesel Tank


(h) Ex. Fans for Classes

Read more
mechanical installations cyprus

Kanika Amavi Hotel Paphos

The Amavi is currently under construction by the award-winning Kanika Hotels & Resorts. Upon completion, it will provide a unique heaven for couples; a tranquil, intimate environment where they can escape from the world outside to enjoy blissful relaxation.

mechanical installations cyprus

Following years of cooperation with Kanika Hotels & Resorts, Z&X Mechanical Installations has proudly been appointed by Kanika Developments for the complete mechanical services installation for Kanika Amavi Hotel in Paphos.

A 5-floor hotel with 155 rooms including various suites, various public areas (bars, restaurants, etc.) 3 public pools and 14 private pools for cabana rooms.

Below is the project description of the works carried out by Z&X Mechanical Installations Ltd.

(A) A complete air conditioning system is installed and consists of:

  1. One Multipurpose Chiller /Heat Pump producing hot and cold water at the same time. (Located on the hotel roof 5 floors up)
  2. One Chiller / Heat pump producing either hot or cold water as the seasons require for heating or cooling.(Located on the hotel roof 5 floors up)
  3. Fan coil units (FCU) to all the rooms supplying heating or cooling (From heat pumps.)
  4. Fan coil units (FCU) for small public or staff rooms supplying heating or cooling (From heat pumps.)
  5. Air handling units (AHU) supplying heating or cooling to large open public areas via ducting and grills (from heat pumps)
  6. PPR (Polypropylene) piping network throughout the hotel supplying hot or cold water to FCU’s, and AHU’s
  7. Large 200 mm Diameter main line PPR piping network in risers from Main plant room in the basement to and from Heat pumps on the roof. Butt welding method is used for assembling the various components for these pipes. They are assembled on site and then fixed in position

(B) A complete domestic hot water reticulation system is installed and consists of:

  1. A solar system is installed to provide domestic hot water .The Solar system is using all the available solar energy and at times when it’s not enough supplemented by a multipurpose heat pump on the hotel roof and or two boilers in the plant rooms.
  2. Multipurpose heat pump supplementing the solar system
  3. Two Light Oil/ Kerosene Boilers to supplement the solar system and the Multipurpose heat pump as well as provide heating for the various pools in the hotel.

The system consists of  48 number Solar panels , 3 Hot water cylinders , One Multipurpose heat pump (Also used for Air- Conditioning at the same time), Two Boilers, heat exchanges and circulating pumps.

(C) A complete plumbing system is installed consists of:

  1. A network of PPR piping (Hot, Cold, Drinking and Toilets) distributing water throughout the hotel to all rooms and staff and public areas as required.
  2. Pex C pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water .
  3. A complete sewage system consists of UPVC  plastic piping within concrete slabs and foundations and PPR 12 DB exposed piping within ceilings. for all the sanitary fittings to the first outside manhole.
  4. A Number of pumping stations throughout the hotel grounds to send sewage to the main municipal pipe lines.
  5. Installation and Connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories.
  6. An inverter pressure pump system is installed to provide high water pressure to all the sanitary fittings, saving water as well as energy.

(D) A complete ventilation and fresh air system is installed consists of:

  1. Ventilation and fresh air ducting with fans.

(E) A complete fire fighting system is installed and consists of:

  1. A pump set that sends water to all fire hose reels with a Diesel back up in case of power failure.
  2. A galvanised pipe network to distribute water to all fire hose reels.
  3. Two dry risers to supply water from external sources for fire fighting
mechanical installations cyprus

AMAVI HOTEL CENTRAL BLOCK

mechanical installations cyprus

AMAVI HOTEL BLOCK A

mechanical installations cyprus

AMAVI HOTEL BLOCK B

mechanical installations cyprus

PEXC PIPE IN PIPE CONNECTION TO MANIFOLDS TO SUPPLY WATER TO SANITARY FITTINGS

mechanical installations cyprus

AC AND WATER SERVICES PPR PIPE INSTALLATIONS IN CEILING SPACE

mechanical installations cyprus

BUTT WELDING ASSEMBLY OF LARGE 200mm DIAMETER PPR PIPES USING SPECIALISED BUTT WELDING MACHINE

mechanical installations cyprus

LARGE 200mm DIAMETER PPR PIPES PRE ASSEMBLED READY FOR INSTALLATION

mechanical installations cyprus

INSTALLED FCU (ROOMS AC)

mechanical installations cyprus

INSTALLED PPR AC AND WATER SERVICES PIPING, VENTILATION DUCTING AND GALVANISED FIRE FIGHTING PIPING IN ROOM PASSAGES

mechanical installations cyprus

VENTILATION AND FRESH AIR DUCTING WITHIN CEILING SPACE

mechanical installations cyprus

LARGE 200mm DIAMETER PPR PIPES INSTALLED IN CEILING TOWARDS PLANT ROOM

Read more
mechanical installations paphos

DESCRIPTION OF PROJECTS – SEK OFFICES



Cyprus Workers’ Confederation (SEK) is an independent trade union and represents workers in the private sector, government blue-collar workers, workers in semi-governmental utility organisations, as well as local authority workers. Affiliated to SEK are seven branch Federations, organising workers in all sectors of the economy. SEK has five Labour Centres in the main cities of Cyprus, representing the Confederation in the districts.

One of our completed projects are the offices of SEK in Paphos, and the description of the works completed are below:

( A ) A Central Ventilation / cooling heating  system is installed to provide  space heating for the conference area and auditorium.

The  system is consists of : a) 250 Kw Hitachi Heat pump chiller, with 3 Roccheggiani AHU’S with insulated ducting, grills and plenums as well as  pumps & controls.  

( B ) A hot water system is installed to provide domestic hot water. The system consists of Electric direct hot water heaters (3Kw / 10L) installed in each wet area.

( C ) (a) A smart VRV system is installed for the space air conditioning and heating of the building. The system consists of (a) 6 air cooled DAIKIN Outdoor units and 50 Indoor units (Round flow cassettes) for the 2nd and 3rd floor offices.(b) 7 water cooled DAIKIN Outdoor units, 39 Geothermal wells (100m / with Ø32mm probe and grouting), pumps, controls and plant room fittings, and 45 Indoor units (Round flow cassettes) for Shops, reception, cafeteria and 1st floor offices.  

The main benefit of the air and Water cooled cooled VRV system from the split unit type air conditioning is the efficiency (20 to 30 % higher for air cooled and 40 to 50% for water cooled), the less number of outdoor units and the ability to install the outdoor units much longer distance from the indoors.

( D ) A complete plumbing system is installed consisting of : (a)  Central pipes (PPR-80) and final piping for both offices and shops in Pipe in Pipe PEX-C. (b) a complete sewage system consists of all the  plastic piping (PPR 3 LAYER) for all the sanitary fittings to the first outside manhole. (c) Connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. (d) 1 pressure pump system for the office and common W.C’S  is  installed  to provide high water pressure to all the sanitary fittings, saving water as well as energy  (e) Pump stations in basement for both waste water and Rain water.

( E ) Ventilation of  the main office area (common area) with  5 DAIKIN  HRV (Heat Recovery) unit with ducting and grills which provide recirculation of air conditioned air in conjunction with the VRV system, saving up to 30% on energy costs. Ventilation of W.C. areas with  box fans (Exhaust) with ducting and grills.

( F ) Fire fighting system consisting of 10 fire hose reels in cabinets ( with extinguishers)   located throughout the building, with Grundfos fire booster and 5000L water tank. A provision for wet riser is provide in the basement parking system.

mechanical installations paphosmechanical installations paphosmechanical installations paphosmechanical installations paphos

Read more
mechanical installations cyprus

Zevalio Holdings Argaka Village

Finishing an existing un-finished house as well as a newly built smaller structure to serve as the servant’s quarters.

Z&X Mechanical installations is the sub-contractor for finishing all the plumbing and air conditioning works pending at the un-finished house and to find solutions for the additions the customer requests. In addition, we are installing all the provisions in regards to plumbing and air conditioning in the servant’s quarters. 

A solar system will be installed to provide domestic hot water. The Solar system is using all the available solar energy and at times when it’s not enough then the gas boiler is switched ON through a smart BMS control system.

The solar system will consist of 3 Solar panels 2.0 x 1.0, 1 300L Hot water cylinder with C.H Coil and a circulating pump with press control.

A clever smart solar system will be installed to provide all the electricity needed for the filtration and circulation system of the swimming pool. It will consist of 8, 250 Watt Photovoltaic panels, 1 solar pump and 1 Controller. This system is enough to keep the swimming pool clean all day long without the use of any electrical supply.

A 5KW Net metering will be installed to provide as much of the electricity needed during the day, as possible. It will consist of 20, 250 Watt Photovoltaic panels.

When it comes to the space air conditioning and heating, split units will be installed, as well as a 40kw Gas Boiler for the heating of the Main House (un-finished) and a 9kw Electric Boiler for the heating of the servant’s quarters. The system for the Main house consists of 4 air cooled Outdoor units, and 7 Indoor units. The system for the servant’s quarters consists of 1 air cooled Outdoor units, and 2 Indoor units.

A complete plumbing system is installed and consists of: (a) pex pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water. (b) a complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the fist outside manhole. (c) connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. (d) an inverter pressure pump system is installed to provide high water pressure to all the sanitary fittings, saving water as well as energy.

All the electromechanical work, machinery and systems of the swimming pool will be installed and will consist of: (a) all pvc piping from the pumps and filters in the plant room to all the inlets, drains and other fittings in the swimming pool. (b) all the fittings in the swimming pool like inlets, drains vacuum point, lights and fixtures. (c) all the electrical work like wiring, control and electrical panel, connection of lights, pumps and fixtures. (d) supply and installation of all the machinery and equipment in the plant room like pumps, filters and fixtures.

mechanical installations cyprusmechanical installations cyprusmechanical installations cyprus

mechanical installations cyprusmechanical installations cyprusmechanical installations cyprus

Read more

Imbahim’s Khan – Pafos 2017



Z&X Mechanical Installations Ltd has been chosen to be part of the restoration and reuse of Imbahim’s Khan. Our proud team of trained and experienced engineers and technicians have successfully completed the mechanical installations of the project and a list of the works is displayed below.

(A)

A hot water system consisting of 2 No 150L hot water tanks with 3KW element (Restaurant and Bakery) – 6 No. 50L hot water tanks with 2KW element (Guest rooms and changing rooms) and 14 No. 10L / 1.5KW direct flow electric water heaters for workshops.

(B)

A smart VRV system is installed for the space air conditioning and heating of the Restaurant, Bakery and Exhibition area. The systems consists of 3 air cooled Outdoor units (CARRIER) and 15 Indoor units (9 concealed, 4wall types & 2 cassettes). The benefits of the air cooled VRV systems from the spit unit type air conditioning is the efficiency (20 to 30 % higher), the less number of outdoor units and the ability to install the outdoor units much longer distance from the indoors.

CARRIER Split units (2 concealed, 1 cassette and 17 wall types ) are installed in the changing rooms, workshops and guest rooms)

(C)

A complete plumbing system is installed and consists of: (a) Central Pex pipes and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water. (b) a complete sewage system consists of all the PVC plastic piping for all the sanitary fittings to the first outside manhole. (c) connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. (d) 4 Grundfos CME (Restaurant, Bakery, Coffee shop and Common areas) pressure pump systems to provide high water pressure to all the sanitary fittings, saving water as well as energy.

(D)

Ventilation of the Restaurant and bakery area with a CARRIER HRV (Heat Recovery) unit with ducting and grills which provide re circulation of air conditioned air in conjunction with the VRV system, saving up to 30% on energy costs. All WC areas with inline ceiling mounted fans, ducting and grills.

Air curtains are also installed in the restaurant area.






Ibrahim’s Khan has undergone a massive renovation recently, as part of a wider project to upgrade Paphos town which holds the Cultural Capital of Europe title this year.

Historically, the beautiful old building used to be an inn and the space was also used as an area where merchants and craftsmen would come together.

The use of the individual units have now been defined by the municipality, and a total of 15 units are used mainly for the promotion of the traditional professions and products of Cyprus, as well as the promotion of other local traditions.

“This is a cultural venue and not a modern shopping mall, so it is imperative that we reflect that, we have to promote tradition and we will be strict with who and what is permitted” a spokesman said.

“This is a very important venue in the heart of the old town and will provide an integral meeting place for both locals and visitors alike,” he added.

Exhibitions and other events will be held regularly, as well as demonstrations of traditional crafts.

pafos 2017
pafos 2017
pafos 2017
pafos 2017
pafos 2017
pafos 2017
pafos 2017
pafos 2017
pafos 2017
pafos 2017
pafos 2017
pafos 2017
pafos 2017
Read more
photovoltaic systems cyprus

Private Residential Property



A Central heating system with Hydraulic underfloor system (Roth) is installed to provide space heating as well as domestic hot water.

 

The system consists of 30 Kw condensing Gas boiler & 3 towel rails with 500kg LPG tank, pumps & controls.

 

The Ground floor living area has 2 SAMSUNG ceiling concealed split units for the space air conditioning and heating. The rest of the house has provisions for wall type split units.



 

Read more

Constantinou Bros Athena Royal Beach Hotel – Project Update

Constantinou Bros Athena Royal Beach Hotel is an adult-focused, four star, waterfront hotel in Kato Paphos.

 

Years after our first mechanical installations in the Athena Royal Beach Hotel, Z&X Mechanical Installations Ltd has been chosen again by the company, to be part of the renovation of their hotel. The project is due to be completed and this is an update of the works by our dedicated team. 

 

Constantinou Bros Athena Royal Beach Hotel is now renovating and adding an additional floor which will be occupied by over 40 rooms.

 

Z&X Mechanical Installations Ltd has been appointed for the following works:

• Labeling, disconnection of 22 existing VRV compressors (vacuum & gas recovery for each system).

• Labeling, disconnection of 2 chilers, pumps, panels & accessories, all piping on roof.

• Labeling, disconnection & removal of all exhaust fans & ducting on roof.

• Extension of VRV piping drains and electrical to 4th floor. Re connection of vacuum, recovery of 22 compressors, start–up & commissioning.

• New copper piping provision for 42 split units with drains & electrical works.

• Installation of split units (concealer) with plenums & grills.

• Extension of ducting to 4th floor & re – installation of existing duct work & fans on roof.

• Installation of new fans to 4th floor extension & new ducting for above.

• Re positioning of 2 chillers on roof, re installation of all pumps, panels, controls on roof & start–up.

• New piping to 4 AHU ground floor.