renewable energy systems cyprus

TESSe2b: What – Who – Why – Where

TESSe2b Project – Thermal Energy Storage Systems for Energy Efficient Buildings is a EC financed H2020 four years project, that develops an integrated solution for residential building energy storage using solar and geothermal energy, with the purpose of correcting the mismatch that often occurs between the supply and the demand of energy in residential buildings.

That is achieved by integrating compact Thermal Energy Storage Tanks with Phase Change Materials (PCM TES) coupled with enhanced Phase Change Materials inside the borehole heat exchangers (BHEs), and using an advanced energy management smart self-learning control system.

A demonstration and on-site monitoring evaluation of small scale TESSe2b solution in buildings in three pilot sites (Austria, Spain, Cyprus) are being conducted in order to evaluate the system’s integration into buildings space, to assess the impact of TESSe2b solution in different climates and to provide evidence about its overall technical and economic feasibility.

The second workshop of the project was held in Cyprus hosted by the Cyprus partner, Z&X Mechanical Installations, at Neapolis University in Paphos on 25th April 2018 where TESSe2b preliminary results were presented to Cypriot stakeholders, potentially interested in TESSe2b solution. 
During the day, in the B2B meetings, partners and stakeholders discussed about the benefits and constraints that this solution could face in the market, with special focus on two technical aspects: PCM applications and the control system.

renewable energy systems cyprus
renewable energy systems cyprus
renewable energy systems cyprus
renewable energy systems cyprus
renewable energy systems cyprus

During the next two days all the partners of the project conducted their meetings and also visited the house in Miliou, Paphos where the local demosite will be installed. 

The property is a residential house in Meliou village, a small traditional village, 35km from Pafos town airport and 14km from the Latchi beach area. The surface of the house is 180m2 (100m2 of ground floor and 80m2 of first floor). It is built in a plot of 3500m², which is at a high of 420 m from the sea level. The building is of brick plastered walls and roof tiling. The underground area is rich in geothermal energy due to the number of water springs and underground waters. The house is 28 years old and it’s in good condition.

renewable energy systems cyprus
renewable energy systems cyprus
renewable energy systems cyprus
Read more
mechanical installations cyprus

YIOLOU CO OP BANK – DESCRIPTION OF PROJECT

(A) A solar system is installed to provide domestic hot water. The Solar system uses all the available solar energy and at times when it’s not enough a 3 Kw electric element is used.

The solar system consists of 2 Solar panels 1.50x 1.0 and 150 Litre Hot water cylinder.

(B) A smart VRV system is installed for the space air conditioning and heating of the common bank area. The system consists of 1 air cooled Outdoor unit (DIAKIN 49Kw) and 12Wall type Indoor units. The benefits of the air cooled VRV system from the spit unit type air conditioning is the efficiency ( 20 to 30 % higher ) , the less number of outdoor units and the ability to install the outdoor units much longer distance from the indoors . A split unit is installed in the server room.

(C) A complete plumbing system is installed consisting of: (a) Pex-c Pipe-in -Pipe for the central and final piping (with manifolds) of all the sanitary fittings for both the hot and cold water as well as the drinking water. (b) a complete sewage system consists of all the PVC plastic piping for all the sanitary fittings to the first outside manhole. (c) connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. (d) 1 pressure pump system (Grundfos inverter MQ3-35) & 1 No. 1100L cold water tank to provide high water pressure to all the sanitary fittings, saving water as well as energy.

(D) Ventilation of the W.C, entrance area and archives with inline (supply and exhaust) fans, ducting and grills.

Read more
mechanical installations cyprus

RENOVATION OF SCHOOL IN LYSOS TO COMMUNAL CENTRE

Lysos is a beautiful mountain village in the Paphos district which continues to preserve the Cypriot traditional architecture as many of the old houses have been restored.

Z&X Mechanical Installations Ltd recently completed the transformation of the school into a communal centre, with the renovation including installations of a solar system, a smart VRV system, complete plumbing and irrigation systems, etc. of which the descriptions are listed below.

( A )

A solar system for the common areas is installed to provide domestic hot water. The Solar system uses all the available solar energy and at times when it’s not enough a 3 Kw electric element is used.

The solar system consists of 2 Solar panels 2.0x 1.0 and 300 Litre Hot water cylinder. An electric hot water cylinder (60L) supplies hot water for W.C. areas in the basement cinema area.

( B )

A smart VRV system is installed for the space air conditioning and heating of the old school (Library) & the communal basement area. The system consists of 2 air cooled Outdoor unit (Toshiba 40Kw & 56Kw) and 15 Indoor units (2 concealed,  2 wall types &11 concealed floor types). The benefits of the air cooled VRV system from the spit unit type air conditioning is the efficiency (20 to 30% higher), the less number of outdoor units and the ability to install the outdoor units much longer distance from the indoors.

( C )

A complete plumbing system is installed consists of:

  1. Central pipes PPR-80, & PEX-c Pipe-in-Pipe and manifolds for the  final piping of all the sanitary fittings for both the hot and cold water as well as the drinking water. b) a complete sewage system consists of all the PVC plastic piping for all the sanitary fittings to the first outside manhole.
  2. Connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories.
  3. 1 pressure pump system (Grundfos inverter) & 2 No. 1600L cold water tanks to provide high water pressure to all the sanitary fittings, saving water as well as energy.

( D )

A complete irrigation system consisting of 2No. 3200L water tanks, Grundfos SP submersible pump, 9 zone controller and electric valves, and piping ring to all final points.

( E )

Ventilation of the W.C and cinema areas with inline fans, ducting and grills.

( F )

Fountain with two skimmers, two drains, 4 inlets, auto filling system, 25 LED mini lights, 21” sand filter, 0.75 HP pump, Hayward salt chlorinator all piping and fittings, electrical panel and controls.

Read more

Πλατεία Διοικητηρίου Πάφος

Another infrastructure project that will change the image of the city, will improve its economy and improve the quality of life of the public. 

Below is the description of works carried out and completed by the engineers and technicians of Z&X Mechanical Installations Ltd.

(A)

A solar system (provision) is installed to provide domestic hot water .The  Solar system is using all the available solar energy and at times when it’s not enough a 3 Kw electric element .

The solar system consists of 2 Solar panels 2.0x 1.0 and 300 Litre Hot water cylinder.

(B)

A smart VRV system (provision) is installed for the space air conditioning and heating of the assembly area. The system consists of 1 air cooled Outdoor unit and 8 Indoor units (6 concealed & 2 wall types). The benefits of the air cooled VRV system from the spit unit type air conditioning is the efficiency ( 20 to 30 % higher ), the less number of outdoor units and the ability to install the outdoor units much longer distance from the indoors .

(C)

A complete plumbing system is installed consists of : (a)  Central pipes Pex pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water. (b) A complete sewage system consists of all the PVC plastic piping for all the sanitary fittings to the first outside manhole. (c) Connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. (d) 1 pressure pump system (provision) to provide high water pressure to all the sanitary fittings, saving water as well as energy.

(D)

Ventilation of the cafeteria area (provision) with HRV (Heat Recovery) unit with ducting and grills which provide recirculation of air conditioned air in conjunction with the VRV system, saving up to 30% on energy costs. All W.C areas with inline fans, ducting and grills.

(E)

Fountain with four skimmers, two drains, ten jet nozzles, auto filling system, five LED mini lights, sand filter, pump, all piping and fittings, electrical panel and controls.

 

Read more
mechanical installations

DIMOS PAFOU – PLATEIES DOIKITIREIOU

( A )
A solar system(provision) is installed to provide domestic hot water .The Solar system is using all the available solar energy and at times when it’s not enough a 3 Kw electric element .
The solr system consists of 2 Solar panels 2.0x 1.0 and 300 Litre Hot water cylinder.

(B)
A smart VRV system(provision) is installed for the space air conditioning and heating of the assembly area . The system consists of 1 air cooled Outdoor unit and 8 Indoor units (6 concealed & 2 wall types) . The benefits of the air cooled VRV system from the spit unit type air conditioning is the efficiency ( 20 to 30 % higher ) , the less number of outdoor units and the ability to install the outdoor units much longer distance from the indoors .

( C )
A complete plumbing system is installed consists of : ( a) Central pipes Pex pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water. ( b ) a complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the first outside manhole. ( c ) connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. ( d ) 1 pressure pump system(provision) to provide high water pressure to all the sanitary fittings, saving water as well as energy .

( D )
Ventilation of the cafeteria area (provision) with HRV (Heat Recovery) unit with ducting and grills which provide recirculation of air conditioned air in conjunction with the VRV system, , saving up to 30% on energy costs. All W.C areas with inline fans, ducting and grills.

( E )
Fountain with four skimmers, two drains, ten jet nozzles, auto filling system, five LED mini lights, sand filter, pump, all piping and fittings, electrical panel and controls.

Read more
mechanical installations cyprus

The King Jason hotel in Paphos



The King Jason Paphos is a 4-star luxury hotel in Cyprus, situated around 1km from Geroskipou Municipal Beach and Paphos Harbor. Only a few minutes’ walk from King’s Avenue Mall, the ancient Medieval Castle of Paphos and the archaeological site of UNESCO heritage.

Z&X Mechanical Installations has been chosen to be part of their most recent renovation. Our proud team of trained engineers and technicians have successfully taken on the project for mechanical installations, including cooling and heating with the installations of VRV units and cassettes throughout the building, and plumbing with the installations of shower drains and sewage systems throughout the building.    

The gallery shows a project in progress, and a full description of the project will be published shortly. 



 

Read more
mechanical installation

PAFILLIA MINTHIS HILLS VILLA

( A )
A Central heating system with DEVI electric under floor heating & 6 No. Touch thermostats is installed to provide space heating.

( B )
A solar system is installed to provide domestic hot water .The Solar system uses all the available solar energy and at times when it’s not enough an electric element is switched ON through a KNX control system .
The solar system consists of 2 Direct flow vacuum tube Solar panels 2.0x 0.5 & a 200 Litre Hot water cylinder with solar pump, differential control.

( C)
A smart VRV system is installed for the space air conditioning and heating of the villa. The system consists of 1 Daikin air cooled Outdoor units and 5 Indoor units ( Ceiling concealed with ducts & grills) . The benefits of the air cooled VRV system from the spit unit type air conditioning is the efficiency ( 20 to 30 % higher ) , the less number of outdoor units and the ability to install the outdoor units much longer distance from the indoors .

( D )
A complete plumbing system is installed consisting of : ( a) Central pipes using Pex-C pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water through out the villa. ( b ) A complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the first outside manhole. A pump station in the plant room with 2 Standby / Duty pumps & controls is installed ( c ) Connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. ( d ) 2 pressure pump systems are installed – (1 for Domestic water & 1 for the W.C. system) to provide high water pressure to all the sanitary fittings, saving water as well as energy. (e) A Hot water return system with circulating pump is also installed to provide instant hot water via push buttons outside each bathroom via the KNX system. (f) Water softener to provide soft water for domestic use.

( E )
Ventilation of all W.C areas with inline fans, ducting & grills with speed controls via the KNX system.

( F )
Gas supply system to fire place and BBQ Gas detector & auto shut off valve.

Read more
mechanical installation

KING JASON APARTMENTS & COMMON AREAS

APARTMENTS

( A )

A solar system is installed to provide domestic hot water .The  Solar system is using all the available solar energy and at times when it’s not enough then the Gas  boiler is switched ON through a  control system .

The solar system consists of  3 Solar panels 1.5x 1.0  & 1 x 400 Litre  Hot water cylinder for each floor.

 

( B )

A smart VRV system is installed for the space air conditioning and heating of the extra 2 floors (3rd & 4th ) . The system consists of 1 Daikin air cooled  Outdoor unit and 12  ceiling concealedIndoor units  . The benefits of the air cooled VRV system from the spit unit type air conditioning is the efficiency ( 20 to 30 % higher ) , the less number of outdoor units and the ability to install the outdoor units much longer distance from the indoors .

 

( C )

A complete plumbing system is installed consisting of : ( a)  Central pipes & final piping to sanitary ware with PPR-80 for both the hot and cold water as well as the drinking water. ( b ) A complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the first outside manhole. ( c ) Connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. ( d ) 2 existing  pressure pumps systems are  re installed  to provide high water pressure to all the sanitary fittings, saving water as well as energy .

 

( D )

All W.C areas with inline fans, ducting and grills.

 

COMMON AREAS AND KITCHENS

( A )

Domestic hot water is supplied via the existing Oil  boiler i through a  control system .

 

( B )

Split units are installed in these areas. 4 DAIKIN  round flow cassettes in veranda area. 4 wall type DAIKIN split units in kitchen and Lantza areas, 2 DAIKIN ceiling concealed split units in Guest change rooms.

 

( C )

A complete plumbing system is installed consisting of : ( a )  Central pipes & final piping to sanitary ware with PPR-80 for both the hot and cold water as well as the drinking water which are connected to the existing central pipes. ( b ) A complete sewage system consists of all the pvc plastic piping for all the sanitary fittings & floor drains to the first outside manhole. ( c ) Connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. ( d ) All piping is connected to  existing  pressure pumps systems are  re installed  to provide high water pressure to all the sanitary fittings, saving water as well as energy .

 

( D )

All W.C areas & store rooms  have inline fans, ducting and grills.

Read more

Droushia Municipality Building

Description of Project

(A)
A solar system is installed to provide domestic hot water. The solar system consists of 3 Solar panels and 1 x 250 L Hot water cylinders.

(B)
A smart VRV system is installed for the space air conditioning and heating. This HAIER system consists of 5 air cooled outdoor units and 33 indoor units. The benefits of the air cooled VRV system from the spit unit type air conditioning is the efficiency (20 to 30 % higher), the less number of outdoor units and the ability to install the outdoor units much longer.

(C)
A complete plumbing system is installed consists of: (a) Pex pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water. (b) A complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the fist outside manhole. (c) Connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. (d) An inverter pressure pump system is installed to provide high water pressure to all the sanitary fittings, saving water as well as energy. (e) Pump Stations – one for waste water drainage and one for rainwater drainage with Grundfos pumps (standby duty).

Read more
Evangelismos Hospital paphos

EVANGELISMOS PRIVATE HOSPITAL

PROJECT DESCRIPTION

EVANGELISMOS PRIVATE CLINIC – PAFOS

( A )

A solar system is installed to provide domestic hot water. The Solar system is using all the available solar energy and at times when it’s not enough then Oil boiler is switched ON through a smart BMS control system .

The solar system consists of 20 Solar panels , 2 Hot water cylinders , circulating pumps and solar control station .

( B )

A smart VRV system is installed for the space air conditioning and heating . The system consists of 18 air cooled Outdoor units and 108 Indoor units . The benefits of the air cooled VRV system from the spit unit type air conditioning is the efficiency ( 20 to 30 % higher ) , the less number of outdoor units and the ability to install the outdoor units much longer .

( C )

A complete plumbing system is installed consists of : (a pex pipe in pipe piping and manifolds for the piping of all the sanitary fittings for both the hot and cold water as well as the drinking water . (b) a complete sewage system consists of all the pvc plastic piping for all the sanitary fittings to the fist outside manhole. (c) connection of all the sanitary fittings to the plumbing and sewage piping and installation of all the accessories. (d) an inverter pressure pump system is installed to provide high water pressure to all the sanitary fittings, saving water as well as energy. (e) a water softener is installed for the production of soft water , avoiding building up of scale, saving energy and giving long life to all mixers , kitchen equipment and sanitary fittings.

( D )

A complete system of 100% fresh air is installed to provide conditioned air to the operating theatres of the clinic consisting of two air cooled chillers, Air handling units, HEPA filters 100% fresh air, duct work and grills.

Read more
Show Buttons